US-19 from W Jump Ct to W Fort Island Trail

Project: US-19 from W Jump Ct to W Fort Island Trail
Owner: FDOT
Fin Project No.: 405822-3-52-01
Contract No: T7407
Current Contract Value: $45,800,569
Contract Completion: Late 2023

Overview: PCS was chosen as the completion contractor by Western Surety for this FDOT project.  The project consisted of reconstruction and widening of 4.8 miles of roadway from 2 to 3 lanes in each direction as well as a 10’ wide Shared Use Path running the entire length of the project.  

Major components of the project performed by PCS include:

  • 185,000 SY – Asphalt Base
  • 41,000 TONS – Traffic Level C Asphalt
  • 12,000 TONS – FC 5 Friction Course 
  • 168 EA – Drainage Structures
  • 13,200 LF – Drainage Pipe ranging in size from 48”x76” to 18”
  • 32,000 LF – Curb & Gutter
  • 11,000 SY – Concrete Sidewalk

Subcontracted work includes:

  • Lighting and Signalization – 4 Intersections
  • ITS Installation – Project Length
  • Pavement Markings – 140 Miles
  • Signing – 361 EA